Minister of Public Works Dr. Noura Al-Mashaan reaffirmed the ministry’s dedication to finishing up complete highway upkeep and asphalt laying works throughout all governorates, stressing on the similar time that discipline groups are executing initiatives in line with set timetables to make sure effectivity and prime quality.
In Mubarak Al-Kabeer Governorate, Engineer Noura Al-Mutairi, Contract Supervisor (18), reported that the ministry groups had been on-site in Al-Masayel – Block 5 to observe progress beneath the brand new contracts for radical highway upkeep.
The work consists of laying a 5-cm layer of Kind 3 asphalt.
She famous that the roadworks in Abu Ftaira (Plots 6, 7, and eight) and Al-Masayel (Plot 4) have already been accomplished, whereas work is now being finalized in Al-Masayel, Plot 5.
Observe The Occasions Kuwait on
X, Instagram and Facebook for the newest information updates
