Dubai’s Roads and Transport Authority (RTA) has accomplished the second part of a air flow and air con system overhaul throughout stations on the Pink and Inexperienced Strains of the Dubai Metro.
The Rail Company carried out the work as a part of RTA’s Strategic Plan 2024–2030, which covers passenger consolation, buyer happiness, operational effectivity, and asset sustainability.
The initiative aligns with RTA’s imaginative and prescient to change into the World Chief in Seamless and Sustainable Mobility, the Dubai Media Workplace mentioned in a statement.
Dubai Metro enhances cooling techniques
The challenge represents one other milestone within the partnership between RTA and Keolis-MHI to boost service high quality and put together infrastructure for Dubai’s summer season season.
The second part concerned overhauling 876 air flow and air con property throughout 14 stations and two automotive parks alongside the Pink Line. Practice operations continued with out disruption throughout the work.
This part follows the completion of Part 1, which coated 261 property throughout 13 stations.
The work included changing and refurbishing air dealing with models (AHUs), fan coil models (FCUs), chilled water pumps, extract followers, smoke extract followers, and pressurisation models.
Groups additionally carried out bearing and cooling coil substitute, deep cleansing, and dynamic balancing to revive tools to unique design efficiency.
Dubai’s summer season season creates demanding situations for public transport techniques. Trains arrive each couple of minutes, doorways open each 2–4 minutes, and sizzling air enters station environments constantly.
The air flow and cooling techniques should function at capability to keep up inner temperatures between 24°C and 25°C throughout the community, making certain passenger consolation no matter exterior situations.
The ten-month programme occurred exterior peak hours and through evening shifts to keep up easy station operations and passenger expertise all through the execution interval.
Preparations have begun for Part 3, which is able to goal the remaining 25 per cent of public-area FCUs and back-of-house and significant room AHUs throughout Pink Line stations. Experimental and verification works for this part started in mid-July 2025.
RTA is advancing its Air flow and Air Conditioning (VAC) Enhancement Challenge to discover vitality optimisation alternatives and transition towards variable movement know-how.
The challenge outcomes from coordination between RTA’s Rail Company and Keolis-MHI, which operates and maintains the Dubai Metro and operates the Dubai Tram. The collaboration demonstrates the partnership’s dedication to delivering service requirements throughout the Dubai Metro community.
